Case StudiesSwivelpole™ access solutions for large storage tanks

Client:Confidential
Distributor Partner:R&M Electrical Group UK / R&M Electrical Europe BV, Holland
Location:Netherlands, Europe
Year:2024
Industry:Oil & Gas

Project Overview

Swivelpole™ was engaged to provide innovative access solutions for the replacement of light fixtures and fixed poles on three large storage tanks in the Netherlands. This project required specialised solutions due to site-specific wind load challenges.

Scope of Work

  • Replacement of Light Fixtures: Upgrading lighting systems on three large storage tanks.
  • Replacement of Fixed Poles: Replacing fixed poles that could not meet the required wind load specifications.
  • Swivelpole™ Solutions: Implementation of Swivelpole™ S2 and Swivelpole™ ST4 solutions, tailored to meet specific design and environmental conditions.

Timeline

  • April 2021: Initial enquiry from the client.
  • 2021: Preliminary engagement and consultations.
  • 2022 - 2023: Detailed design and technical support phase.
  • May 2023: Purchase Order (PO) for Tank 3.
  • January 2024: PO for Tank 2.
  • Q1 2025: Expected supply of poles for Tank 1.
    Products Supplied:
  • S2 and ST4 Poles: Approximately 350 poles, including Cross Arm LMK, were provided to meet the project's unique requirements.

Future Projects

  • Tank 4: Design and construction planned for 2025/2026, with an anticipated additional 150 Swivelpole™ poles required.

Challenges and Solutions

  • Wind Load Compliance: The original fixed poles were insufficient to handle the site's wind load requirements. Swivelpole™ addressed this by supplying customised Swivelpole™ S2 and Swivelpole™ ST4 poles designed to meet these rigorous conditions.
  • Custom Design Needs: The project demanded bespoke designs for both poles and fixtures. Swivelpole™ engineers collaborated with the client to ensure all technical and safety standards were satisfied, providing a secure and reliable solution.

Results and Impact

  • Enhanced Safety: The Swivelpole™ technology allowed for the safe and efficient replacement of fixtures by lowering equipment to a manageable working height, thus minimising the risk associated with working at heights.
  • Increased Reliability: The new lighting and pole systems meet all specified wind load requirements, ensuring durability and consistent performance.
  • Client Satisfaction: The client has expressed high satisfaction with Swivelpole’s solutions and is planning to incorporate the same technology for future tank projects.

Conclusion

Swivelpole™ successfully provided a comprehensive and customised solution for the large storage tank project, overcoming significant challenges related to wind loads and fixture replacement. Our high-quality, products are now available in Europe, bringing innovative access solutions to the region. With our extensive global experience and innovative technology, Swivelpole™ remains a preferred choice for effective access solutions.

Facing access and safety challenges on large storage tank projects?

Swivelpole™ provides innovative access solutions that ensure safe, efficient maintenance and meet the toughest environmental conditions.

Contact us to see how we can help with your project.